Agriculture and supply
It starts in the field.
Grove’s agricultural and food supply operations are the ground the distribution business stands on. They are how we learned what a specification is worth, what a season really does to supply, and what it takes to hold a delivery date.
Fresh · Orcha
Grown and branded at home.
Orcha is Grove’s own fresh produce brand, grown and sold in the Egyptian market. It is the part of the business that keeps us in the field rather than only at the port.
Supply comes from two sources. We farm ourselves, and we contract with small and medium growers under Grove agronomic and quality protocols, with defined varieties, input standards, harvest windows and grading criteria. That structure gives us volume without losing control of quality, and it gives the farms we work with a stable, planned offtake rather than a spot sale.
Fresh produce supply, monthly
-
130 tons monthly supply to Modern Trade
-
70 tons monthly supply to traditional traders
-
100 tons monthly export to the European Union
Figures describe Grove’s fresh produce supply operation. They are not a measure of the wider distribution business.
Asset light
Grove operates asset light. Production runs through contracted manufacturing under Grove specification, formulation and quality control, which lets us move across categories and formats without carrying capacity we do not need.
Contracted manufacturing means the production facility is a partner, not a Grove asset. What Grove holds is the specification, the quality control and the commercial responsibility for the result.
How a product is built
Built for the market that sells it.
The approved sample becomes the reference standard. Every batch after it is measured against that sample, not against a general standard.
-
Step 1, Market read
Category, price point, pack format and the shelf it will compete on.
-
Step 2, Specification
Formulation, concentration, sweetness, heat, size, label language and claims.
-
Step 3, Trial production
Samples produced to that specification and shipped for assessment.
-
Step 4, Approval
Written sign off on the sample, which then becomes the reference standard.
-
Step 5, Production
Every batch measured against the approved reference, not a general standard.
We start with the market, then determine which products belong there.